Biomass System, Stroud School, Romsey

Stroud School employed TNG to design a new district heating system as part of it’s strategy to reduce it’s carbon emissions.

 

Biomass System

The system consisted of 2 no. 160kW biomass boilers located within a newly created plantroom. The biomass system supplies heat across the whole site via pre-insulated buried pipelines. The boilers are fuelled by locally sourced wood pellets that are stored in an external silo.

The primary heat provides heating and domestic hot water to the new classroom and dining pod buildings, plus Highwood House, the main school building. The system will further accommodate a third boiler in the future allowing it to serve the heating and hot water demands of the ongoing expanding site.

 

Client:
Stroud School

Completion:
September 2014

TNG provided:
Design Services & BREEAM AP

 

DOWNLOAD…

 

 

district heating system

Fusion Building, Talbot Campus, Bournemouth University

This project created a new 6000m2 four storey Fusion Building at the Bournemouth University, on the Talbot Campus. Fusion was

Read Case Study

Highcliffe St Mark Primary School

Highcliffe St Mark Primary School required additional teaching space in order to meet the rising demand for primary school places.

Read Case Study

Hartley Library Special Collections Works

TNG was Principal Designer for a specialist refurbishment scheme at Hartley Library, on the Highfield Campus of the University of Southampton.

Read Case Study