Office Condition Survey in Rugby

TNG has been enlisted by CBRE Limited to carry out a condition survey for an office building in Rugby, Warwickshire.

Mechanical Services

We were instructed to assess the condition of the Mechanical engineering plant and systems at Cemex House for CEMEX UK Operations Limited.

Condition Survey

Our team of experts carried out a non-invasive survey of the systems within the 9-storey office building.  They then produced a comprehensive report detailing the current condition of the existing engineering services to submit to the Client. The report contained information relating to the required and recommended remedial works. It also detailed the expected life span of the systems and budget costs for their upgrade to help future planning.

Back to news

29 February 2024

TAKE A LEAP OF FAITH WITH TNG

The 29th of February only comes around once every four years and today is the perfect day to step out

Read News Article

15 January 2024

TNG’s BLUE MONDAY BREAKFAST

The third Monday in January is referred to as Blue Monday, as it is supposed to be the most depressing

Read News Article

09 January 2024

Corporate Sponsorship of Mayflower Theatre

TNG is delighted to renew our Silver Corporate Sponsorship status with the Mayflower Theatre in Southampton. Having sponsored the theatre

Read News Article